How many signal persons should be assigned to a lift?

Correct! Wrong!

What is the meaning of the below signal?

ASME B30.2
Correct! Wrong!

What is the meaning of the below signal?

ASME B30.2
Correct! Wrong!

Should a signal person perform multiple roles during the lift?

Correct! Wrong!

When the signal person places their hand over or beside a signal, what are they asking the operator to do?

ASME B30.2
Correct! Wrong!

What is the meaning of the below signal?

ASMEB30.2
Correct! Wrong!

Before the lifting the load, the crane hook should be directly above___________?

Correct! Wrong!

Whose responsibilty is it to ensure the load does not pass over other workers?

Correct! Wrong!

In order for the signal person to give the below signal to the operator, what must the crane have?

ASME B30.2
Correct! Wrong!

What is the meaning of the below signal?

ASME B30.2
Correct! Wrong!

Who can stop a lift?

Correct! Wrong!

What is the meaning of the below signal?

ASME B30.2
Correct! Wrong!

What is the meaning of the below signal?

ASME B30.2
Correct! Wrong!

What risk is introduced to the lift by using multiple signal persons?